|
|
|||||||||||||||
|
Download the last issue
|
AWS bags more development cash
Published 28.07.2010 11:16:58 by John Bradbury
AWS, whose prototype floating wave power machine has already been tested in Loch Ness, has been granted £350,000 for further research and development of its marine power system. The funding is part of a £7 million package of support for nine marine wave and tidal systems granted by the ETB with support from the UK government. Another beneficiary is MCT based in Bristol, which is progressing its SeaGen system for deeper water installation. For AWS, the ETB funding comes just a month after the company received cash from the Scottish government's Waters – Wave and Tidal Energy Research - programme. “As with WATERS, our application for funding was approved after careful scrutiny by the Technology Strategy Board, and so it is another positive statement about our R&D work to date,” stated Simon Grey, chief executive of AWS. He added: “Our trials on Loch Ness will restart in September for a six week period and thereafter a detailed assessment of the trial results will be undertaken before we start building and then deploy a full-scale version of one of the wave absorption cells.” His company is working on a single utility-scale AWS-III device – a ring-shaped multi-cell floating wave power system - 60 metres (200 ft) in diameter, which could generate up to 2.5 Megawatts (MW) of continuous power. Eventually, with industrial and utility partners, the company is looking to launch a 12-cell, 2.5MW pre-commercial demonstrator in 2012 and then sell the technology commercially. Other beneficiaries of the ETB grants include Aquamarine Power, Aviation Enterprises, Fred Olsen Energy, Green-Tide Turbines, Offshore Wave Energy, Small Hydro and Tidal Generation. ![]() No single cause for Macondo accidentBP says no single factor caused the accident on the Deepwater Horizon rig in the US Gulf of Mexico in April. ![]() Valiant racks up profitNorth Sea operator Valiant Petroleum racked up US $64.5 m of revenue in the first half this year and pulled in higher pre-tax profits. [Les mer ] • Company news ![]() No infringements from HSE reportA report by the UK's Health and Safety Executive on Transocean's operations in the North Sea earlier this year cleared the company of regulatory safety infringements. ![]() Executive denies bullying on rigsA senior executive of drilling giant Transocean has told a UK government committee that there was no bullying taking place on its North Sea rigs. ![]() Suspension for Lambouka 1 gas findLondon-listed Gulfsands Petroleum says the Lambouka 1 well offshore Tunisia in the Mediterranean Sea has been suspended. [Les mer ] • Exploration ![]() Blame expected from BP reportPress speculation in the US is suggesting that BP's internal reports into the Deepwater Horizon disaster in the US Gulf of Mexico is going to spread the blame. |
Renewables
Search
Top stories
Offshore.no
|
|||||||||||||
|
Publisher: Offshore Media Group, Box 1335 Vika 0112 Oslo Editor in chief: Helge Keilen. Online editor: John Bradbury. Telephone: +47 22 83 83 68 | +47 56 31 40 20 | +47 51 56 42 80 Tips: redaksjonen@offshore.no |
|||||||||||||||